After 2 weeks 
New beam in place and the bottom of the opening was raised up.
[480x640] [1536x2048]
New beam in place and the bottom of the opening was raised up. *
Viewed: 2856 times.

A new header was built above, a new beam, and the doorway to the kitchen is now only 4ft wide.
[480x640] [1536x2048]
A new header was built above, a new beam, and the doorway to the kitchen is now only 4ft wide. *
Viewed: 2940 times.

* Comments available for this item.
Powered by Gallery v1 RSS