Looks like the last paitning adventure killed the power roller. Well, I think I can bring it back if I take it apart and clean it, but I needed to do a second coat ont he living room ceiling and I can’t give my dad back a broken power roller so I got a new […]
Posted in Home work | No Comments »
18
Feb
I replaced the angle-stops, but then I turned the water back on the hot water valve was still leaking slightly. So I turned off the water again and tightened it another turn and now it’s fine. Buying one of each size it might be worked so now I have to return the others to OSH, […]
Posted in Home work | No Comments »
17
Feb
The bathroom tile is now done and next up is the grout. On Tuesday we get the counter tops installed in the kitchen. This weekend plasterers come to finish the wall in the laundry room, the patch in the tv room, the wall in the office. Most importantly, they are going to complete the wall […]
Posted in Home work | 1 Comment »
15
Feb
Last Friday the floor guy, John Crow of Crow’s Quality Flooring, came and installed the kitchen floor. It’s wide and long oak plank running perpendicular to the short narrow oak elsewhere in the house. Its up flush against the shorts so no cap is needed for the transition. The flooring is going to sit there […]
Posted in Home work | 2 Comments »
13
Feb
We got the new GE front loaders delivered on Tuesday of last week but they couldn’t complete the installation of th dryer because we had the wrong size connection at 3/8″. According to the install manual it needed a 1/2″ connection. I saw that I couldn’t just remove the valve because there wasn’t enough clearance […]
Posted in Home work | No Comments »
07
Feb
For her birthday yesterday Nicole painted the dining room wall brown (Benjamin Moore Stone Brown). I prepped the laundry room for painting with the hope that we would get some done before the new washer and dryer arrive today. Fortunately birthday stuff got in the way. While we were working the contractors got the tub […]
Posted in Home work | No Comments »
03
Feb
Wednesday the refrigerator box was built and that night we primered it. Then yesterday Nicole painted it purple. This morning it was put in place so when the people arrive to template the counter tops everything would be in place.
Posted in Home work | No Comments »
01
Feb
You can see some results from my painting in the kitchen. That cleared the way for the contractor to install the cabinets. Unfortunately, two of the upper cabinets were damaged and they will build us new ones. Also the trash drawer was built wrong so they need to fix that too, but that doesn’t interfere […]
Posted in Home work | No Comments »
30
Jan
We needed to get the kitchen painted this weekend so the contractor could start installing the cabinets. Nicole was sick so that left it up to me. Saturday I got the ceiling in the kitchen and dining area, and the ceiling in the living room primered. The Wagner Power Roller helped a lot since I […]
Posted in Home work | 3 Comments »
19
Jan
Monday the bathroom got coats of primer and we were going to paint but we didn’t make it to the paint store before they closed. So Tuesday Nicole painted the bathroom. Yay! It looks good!
Posted in Home work | 2 Comments »